Introduction
The Egyptian Government awarded the joint venture (JV) comprising Metito and Orascom the East Port Said Seawater Reverse Osmosis (SWRO) Desalination Plant under the Armament Authority of the Egyptian Armed Forces and technical supervision of the Engineering Authority of Egyptian Armed Forces-Water Department. The project is in alignment with Egypt’s water security targets by securing the domestic water requirement for a new urban and industrial area in East Port Said. The 150,000m³/day plant is the primary source of drinking water for almost 1 million residents.
The USD130 million plant is built on 79,000m², including an area designated for future expansions to provide up to 250,000m³/day of clean drinking water. The project site was carefully selected to be in proximity to East Port Said city, which is the key beneficiary of the produced water.
With hard work, commitment, and dedication to the highest level of quality, health, safety, and environmental specifications, the East Port Said SWRO plant completed 5million man hours without a single injury or time lost during the construction of the plant. This was an outcome of regular audits carried out through the series of health, safety, and environment (HSE) training.
Metito’s scope of work for this turnkey project covers the design, supply, installation, commissioning, startup, operation, and maintenance for one year.
The project was commissioned and delivered in 2021. Metito is currently performing the operation and maintenance.